Pre-Construction
- [ ] Set budget and contingency (plan for 20% overage)
- [ ] Pull required permits
- [ ] Order fixtures, tile, and vanity (lead times vary)
- [ ] Choose your contractor via the DunRite Bid Board
Demo Phase
- [ ] Shut off water supply
- [ ] Remove old fixtures, tile, and drywall
- [ ] Inspect subfloor and walls for water damage
Rough-In Work
- [ ] Plumbing rough-in (move drains/supply lines if needed)
- [ ] Electrical rough-in (GFCI outlets, exhaust fan wiring)
- [ ] Install cement board or moisture-resistant drywall
Finishing
- [ ] Tile floor and walls
- [ ] Install vanity and toilet
- [ ] Hang mirrors and light fixtures
- [ ] Caulk and seal all joints
- [ ] Final inspection
Pro Tips
- Always use a licensed plumber for drain and supply changes.
- Heated floors add ~$500–$1,500 but dramatically improve comfort.
- Frameless glass showers are trending and make spaces feel larger.